hahdbehzhsHelo2517 hahdbehzhsHelo2517
  • 25-04-2024
  • Engineering
contestada

If a channel on a 4-year construction project was sized to carry the peak runoff rate of a storm with a 5% probability of occurring, what would be the chance (risk of failure) that a runoff event would exceed this capacity?

Respuesta :

Otras preguntas

what was the rations in ww1
a spinner with 10 equally sized slices has 2 red slices, 4 blue slices, and yellow slices. The dial is spun and stops on a slice at random. What is the probabil
4m-3(m +2) what is the answer step by step​
In the library on a university campus, there is a sign in the elevator that indicates a limit of 16 persons. Furthermore, there is a weight limit of 2500 lb. As
Urgent !!!!!!!!!! Due today plzzzzz help me
rome was one of the greatest naval forces of the ancient world true or false
Whatever, Inc., has a bond outstanding with a coupon rate of 5.87 percent and semiannual payments. The yield to maturity is 6.9 percent and the bond matures in
50 points and Brainliest answer question above
HELP PLEASE 3. A child swims 50 yards in 50 seconds. How many FEET can she swim per second?
Make a sketch of a linear relationship with slope 3 that is not a proportional relationship show how you know hay slope is 3 write an equation for the line