NasirKA5457 NasirKA5457
  • 26-04-2024
  • Mathematics
contestada

What is the probability that the critical path for this project will be completed within 200 days?
a) 0.8413
b) 0.9772
c) 0.9974
d) 0.9544
e) 0.9987

Respuesta :

Otras preguntas

Write the equation for the vertical line that contains point E(–7, 7). Choose one answer. a. y = –7 b. y = 7 c. x = 7 d. x = –7
Write the equation for the horizontal line that contains point G(3, 4). Choose one answer. a. y = 3 b. x = 3 c. y = 4 d. x = 4
Real life example of chloroplasts
what is the difference between a autotroph and a heterotroph?
$199 MP3 player; 15% discount
which of the following is closest to 27.8×9.6? A 280 B 300 C 2,800 D 3,000
Which set of numbers can represent the side lengths, in centimeters, of a right triangle? A. 8,12,15 B. 10,24,26 C. 12,20,25 D. 15,18,20
what actions did John Smith take to help Jamestown
how to write 0.326 in expanded form?
what is -7.08 as a fraction in simplest form