Hearttlless2218 Hearttlless2218
  • 22-08-2018
  • Mathematics
contestada

Employee works for 8 hours on 2 days 6 hours on one day and 4 hours on 2 days what is the average number of hours an employee work per day

Respuesta :

bantamirandap3fld3 bantamirandap3fld3
  • 23-08-2018

8 + 8 + 6 + 4 + 4 =30

30 divided by the number of days worked.

30/5 = 6

The answer is 6

Answer Link

Otras preguntas

The arrangement canon of rhetoric involves using literary techniques. A. True B. False
An agriculture company is testing a new product that is designed to make plants grow taller. This can be thought of as a hypothesis test with the following hypo
Can someone help me please
What is the following product 3 root 24 • 3 root 45
Every problem has a solution, Now what is the solution of this?
Which of the following is a proper way to enter an answer of 1.666 on the SAT SPR answer grid? A 1/66 B 1.67 C 1.66 D 1.666
Find the speed of a satellite in a circular orbit around the Earth with a radius 3.57 times the mean radius of the Earth. (Radius of Earth = 6.37×10^3 km, mass
Suppose you pay back $575 on a $525 loan you had for 75 days. What was your simple annual interest rate? State your result to the nearest hundredth of a percent
an interplantetary speedcarft moving at 20000m/s.how far will it travell in one day?(give your answer in km)
Which of the following statements might someone use to most support a decision to buy organic produce? The agricultural demand has caused water shortages in man