raj549985
raj549985 raj549985
  • 25-07-2019
  • Mathematics
contestada

Qn.11 plz help this with step ​

Qn11 plz help this with step class=

Respuesta :

salatulmaghrib
salatulmaghrib salatulmaghrib
  • 25-07-2019
The answer is 7.5 days
explanation:
80 is four times 20.
80 people should be able to do the job four times faster than 20 people.
So, they should take 1/4 the time.
If 20 people take 30 days, 80 people should take 30/4=7.5 days.
**
simpler explanation:
30*20/80=7.5
Answer Link

Otras preguntas

The powers not delegated to the United States by the Constitution, nor prohibited by it to the States, are reserved to the States respectively, or to the people
We need to understand the past so that we might better assess the: select all that apply challenges of the past and the present challenges of the present and th
Jolie uses 2 tomatoes every day to prepare her salad. If n equals the number of tomatoes Jolie had before she made her salad and c equals the number of tomatoes
Anyone know how to do these?
Which molecular geometry is least likely to occur with sp3 hybridization? tetrahedral trigonal planar bent trigonal pyramidal
What is the value of the product (3-2i)(3 + 2i)? O 5 O 9 + 4i O 9–4i o 13
What was the result of the concept of nuclear deference during the Cold War
Jessica got the answer $63.68 to the math question below. Explain in your own words why this answer is correct or incorrect.
What is the value of m? 18/27=6/m 3 9 15 6
Will give brainliest for the first correct answer. How does the author add tension in this excerpt? A:with the protagonist’s conflict B:with an unexplained ide