jacksonj150 jacksonj150
  • 24-10-2019
  • Mathematics
contestada

A contractor has two choices for billing a completed job.

Respuesta :

mrusmason
mrusmason mrusmason
  • 24-10-2019

Answer:

I don't know what the question is but i think this the answer. The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

Step-by-step explanation:

Answer Link

Otras preguntas

what makes a constant term different from a term with a variable
Brittany wants to make cookies for the whole fourth grade. One batch of dough makes 2 dozen cookies. There are 68 fourth grader at her school.Is it reasonable t
How does the biosphere support life?
How does the biosphere support life?
Given A is between Y and Z and YA=22, AZ=16x, and YZ=166, find AZ
What is 40 times 50 using mental math
2 fractions that are the equivalent to 0.400
The earliest Chinese civilization developed near wich river
a diver descends from an elevation of 6 feet below sea level to an elevation of 98 feet below sea level in 4 equal intervals. What was the diver's change in el
What times what equals 160