johnwarren5749 johnwarren5749
  • 22-11-2019
  • Social Studies
contestada

A forecast based on the previous forecast plus a percentage of the forecast error is a(n): weighted moving average forecast. naive forecast. exponential smoothing forecast. qualitative forecast. moving average forecast.

Respuesta :

bIaze
bIaze bIaze
  • 22-11-2019

Answer:

exponential smoothing forecast.

Explanation:

Answer Link

Otras preguntas

What is are,perimeter, and type?
0.6x-0.3y=-1.50.04x-0.02y=-0.1
Can somebody give me some information on Gilda Baron please? It is really important.
Double my tens digit to get my one digit. Doble me and i am less then 50
The cheetah, which is the fastest land mammal, can accelerate from 0.0 mi/hr to 70.0 mi/hr in 3.0 seconds. What is the acceleration of the cheetah? Give your a
A small river that runs into a larger river is known as a(n) ______.A.straitB.isthmusC.tributaryD.delta
What is the answer to this equation 50X6-?=265/ I assume it is poitive 35. Is that correct?
Find 12 1/2% of 96 men
Find 12 1/2% of 96 men
One inch on a map being equal to one mile in real life (or on the surface of the Earth) is an example of what you might find on a map's _________.A.keyB.compass