samanthamr4542 samanthamr4542
  • 23-01-2020
  • Business
contestada

True or False: Production runs can be scheduled in one or two shifts. A. True B. False

Respuesta :

BenitoMarin BenitoMarin
  • 23-01-2020

Answer:

The correct answer is letter "A": True.

Explanation:

The production run represents the number of units a company can produce during its production line. In some cases, the expected production line cannot be covered by one shift of employees. Then, the company allows overtime or implements a second shift to fulfill its objective.

Answer Link

Otras preguntas

Which property states that if a = b and b = c, then a = c? Transitive Commutative Associative Reflexive
please help wil mark branlist if you are right What is the value of y if y = |– 5|
Which of the following is a disadvantage to using tables? Check all that apply. A. They organize the data. B. They force you to do every problem twice, once wit
Carine went to the doctor for a physical. Her blood pressure was 80/50. What describes Carine’s condition, and what is the most likely explanation for how she g
multiply: 3m^3(2m^ + 3m - 1)
In centimeters, what is the unknown length in this right triangle?
What is the area of the polygon given below?
The bond formed between two nonmetal atoms is called covalent. this typw of bond arises from
Fossils, like the Mesosaurus found on both Africa and South America and the Glossopteris plant found on several continents, helped to support the dinosaur era c
I WILL GIVE 10 POINTS. okay so I need to know. what are 2 similarities between equator and Mexico. and 2 differences. HELP.