kalpanathakulla680 kalpanathakulla680
  • 23-02-2020
  • Mathematics
contestada

30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

When two fractions are between 0 and 1/2, how do you know which fraction is greater? Explain
Explain what force caused the movement of the continents from one supercontinent to their present positions
a retailer buys a shirt in bulk at a unit price of $18. the shirt is marked up 36%to sell in the store. what is the price of the shirt in the store
Describe how trade contributed to United States territorial growth.
What is the total energy of a 175,000kg shuttle orbiting the Earth at 600km above Earth's surface?
An object has a weight of 5.10 Newtons (N) at sea level, where the acceleration due to gravity is 9.81 m/s2. What is the acceleration due to gravity on the obje
what is the numerical expression for half the sum of 11 and negative  3andthe absolute value of  negative 62
How are ice and water involved in mechanical weathering
in relation to the earth's surface, explain where rock spend most of there time.
Point B is on the graph of the function f(x) = -3x2. If the x-coordinate of point B is 2, which ordered pair gives the location of point B?