mccole91 mccole91
  • 26-02-2020
  • Mathematics
contestada

Barry can do a certain job in 3 hours, whereas it takes Sanchez 8 hours to do the same job. How long would it take them to do the job working together?

Respuesta :

toriellewilliams toriellewilliams
  • 26-02-2020
It takes them 11 hours to finish the job
Answer Link

Otras preguntas

When the sum of 5 and 6 is subtracted from the product of 5 and 6, what's the difference
Before running as the party candidate in the us presidential election a candidate must first win the A)coin toss, B) party debates, C) campaign trial, D) prim
The first step in designing new technology is to do research. This statement is. Because
is 5.4and 5.400 equal
Which of these statements reflects subjunctive mood? I went to the store because it was having a sale. It was said that the store had a good sale. The store
Find product of 2 5/6x 1 3/4
Use the Distributive Property to find the price of 9 CDs that cost $13.99 each.
some fish are able to see in the darkest depts of the ocean where no sun penetrates, as a result of luminescent body parts
What type of relationship do two people who work the same job share? A. Horizontal B. Flexible C. Management D. Vertical
what's a word phrase for 12x