If 12 workers are needed to run 4 machines, how many workers are needed to run 20 machines

Respuesta :

2020hw
2020hw 2020hw
  • 23-04-2020

Answer:

60 workers

Step-by-step explanation:

4 machines= 12 workers

20 machines= 60 workers

You multiply by 5

Answer Link

Otras preguntas

why must geostationary satellite rotate in the same direction as Earth's rotation?​
Which product is the new England famous for manufacturing Computers, planes ,shoes or cars WILL GIVE BRAINLYEST ANSWER HELP ASAP
A high school track is shaped as a rectangle with a half circle on either side.A rectangle has a length of 96 meters and width of 35 meters. 2 semicircles with
You're a dentist and want your patients to have the cleanest smiles possible. You're not sure which toothpaste to recommend and decide to design an experiment t
please please help me I have a test I need to take! Answer the following questions about the centroid of this triangle!!!!
The second one: Find the nearest 10th.​
The graph shows the function f(x) = 2*. What is the value of x when f(x) = 8? a ) 0 b) 3 c) 1 d) 2
Need help with figuring out this zingoes problem asap, willing to give brainliest!
Which of the following sets is closed under subtraction? none of the above prime numbers rational numbers positive odd numbers
The decomposition of SO2Cl2 is first order in SO2Cl2 and has a rate constant of 1.42 x 10-4 s -1 at a certain temperature. a. If the reaction started with 75.6