jcbola2003
jcbola2003 jcbola2003
  • 23-04-2020
  • Physics
contestada

a mountain climber weighs 42.0 N. If he climbs a hill 100m high. Calculate the work done in joules​

Respuesta :

CHERLYNnotCHERRY
CHERLYNnotCHERRY CHERLYNnotCHERRY
  • 23-04-2020

Answer:

The answer is 4200 J.

Explanation:

The formula of work done is, W = F×D where F is the force of an object and D is the distance. Then you just substitute the values into the equation :

W = F×D

F = 42N

D = 100m

W = 42 × 100

= 4200 J

Answer Link

Otras preguntas

Sodium chloride or table salt is a compound formed when sodium loses its valence electron to chlorine. Which type of bond formation takes place in sodium chlori
what is 5/12 - 3 /8 in simplest form
Nativists views of new immigrants were inaccurate because they overlooked the fact that America had been built by immigrants. True or False?
What the relationship between cellular respiration and photosynthesis discuss the function of chloroplasts and mitochondria?
what two numbers add to -17 and multiply to -16
What is better for the United States — a two-party system or a system without organized political parties? Be sure to give valid examples to support your opini
How does the newspaper help people to share ideas
what does 9e plus 10 mean?
hows the easiest way to remember the french numbersbecause i can't remember them at all
What is the solution for this equation X/2-7=9