matthewmui8 matthewmui8
  • 22-05-2020
  • Mathematics
contestada

if 4 workers can complete a job in 12 days, how many days will it take 3 workers to complete the same job

Respuesta :

babygirl2821
babygirl2821 babygirl2821
  • 22-05-2020
Is there any answer or something
Answer Link

Otras preguntas

Which is an equation of the inverse of y=3/2x?
M^3 is a derived unit why?
A job was budgeted to require 3 hours of labor per unit at $11.00 per hour. The job consisted of 8,000 units and was completed in 22,000 hours at a total labor
A cube that is used as a table is 2ft on each side. how many square feet will be painted if all sides are painted A. 24ft² B. 48ft² C. 36ft²
Explain spermatogenesis and oogenesis.
Who is the world in debt to?? Like the universe?? im so confused lol​
g What is the after-tax yield on a one-year corporate bond with a 7 percent yield if your marginal federal income tax rate is 40% 2.8% 4.2% 5% 5.3% 6.2%
Which of the following is true of hierarchical clustering? a. The data partition does not occur in a single step b. All clusters must have the same number of
After which Cold War event did the United States and the Soviet Union enter a nuclear arms race?
what do you mean by professional education? explain with examples.​