mayedabaig12
mayedabaig12 mayedabaig12
  • 23-07-2020
  • Mathematics
contestada

It takes 4 people 2 days to paint a wall. How long would it take if we got 8 people to do it?

Respuesta :

MyNameZach MyNameZach
  • 23-07-2020

Answer:

if it takes 4 people for 2 days

4+4= 8

so it would only take 8 people for 1 day

Answer Link
S1NGH
S1NGH S1NGH
  • 23-07-2020

Answer:

1 day

Step-by-step explanation:

4 people = 2 days

→ Work out how long 1 person takes

4 people = 2 days

( ÷ 4 )            ( × 4 )

1 person = 8 days

→ Work out how long 8 people can do it

1 person = 8 days

( × 8 )            ( ÷ 8 )

8 people = 1 day

Answer Link

Otras preguntas

What percentage of the total mass of KHCO₃ is made up by nonmetallic elements?  a. 17%  b. 83%  c. 61%  d. 20%  e. 50%
if an organism can not reproduce,is it still considered living?why?
n what way did the Christian Crusades contribute to the decline of the Byzantine Empire ?
7/8,0.98,8/9 least to greatest
Mr. Rowley has 16 papers and 14 exit tickets to return. Ms. Rivera has 64 homework papers and 60 exit tickets to return. For each teacher, write a ratio to repr
15=7-|2x| Solve for x in this absolute value equation.
what is .185 repeating as a fraction
Solve the inequality. -z+20>z+20
what is .54 repeating as a fraction
Which term is used for the tendency of an object to resist a change in its motion? A. acceleration B. displacement C. momentum D. inertia