alexissvjackson
alexissvjackson alexissvjackson
  • 25-09-2020
  • Engineering
contestada

Which of the following is a job title for a worker in the design and pre-construction phase of a construction project?
O carpenter
O construction superintendent
O architect
O building Inspector

Respuesta :

nibhakarna13 nibhakarna13
  • 25-09-2020

Answer:

construction superintendent

Answer Link

Otras preguntas

forms when water is drawn away from the area between high tides
Claire said that 10/15 of her CDs are country music. Which statement could be true based upon this relationship? A. Two-thirds of Claire’s CDs are jazz music. B
Please help Math Analysis !!!!!
Please help. Which describe colloids? Check all that apply.
Indicate the appropriateness of the subject for a four- to six-page research paper by answering the following question. Is the following topic suitable for a re
‼️‼️need help ASAP‼️
What is the solution to –4|–2x + 6| = –24
Y-3=-2(x+5) A.-13 B.-7 C.2 D.8
chase is 57 years younger the. Kori. 8 years ago Kori age was 4 times Chase age. how old is chase
which of the following is not a greenhouse gasA) waterB) carbon dioxideC) nitrous oxideD) propane