D6otty1mejimtaije
D6otty1mejimtaije D6otty1mejimtaije
  • 21-09-2016
  • Physics
contestada

Calculate how much work you need to move a 280 N shed to a platform 5 m above.
A 2,800 J
B. 1,400 J*
C. 56 J

Respuesta :

taskmasters
taskmasters taskmasters
  • 23-09-2016
Work is done when a motion resulted from the force being done by an object. The amount of work done is calculated by multiplying the force applied and the distance traveled. It is calculated as follows:

Work = Force x distance = 280 N x 5 m  =  1400 J.
Answer Link

Otras preguntas

a⁴+b⁴=a²b² ,prove that a⁶+b⁶=0
what is a 1/4 of ?/100
a⁴+b⁴=a²b² ,prove that a⁶+b⁶=0
why is it important to know your variables when conducting an investigatory problem  ?
How and why did the antislavery movement become more radical over the period 1815 to 1860?
Which is the most appropriate unit of measurements to use to measure the thickness of a quarter? Elaborate. A.) meters B.) Kilometers C.) Centimeters D.) Millim
The time t required to drive a certain distance varies inversely with the speed r. If it takes 2 hours to drive the distance at 40 miles per hour, how long will
solve for r F= k (m1m2/r^2)
Can someone please answer this
why might someone want to flee to afghanistan to seek a home in a new country