sunshinny00
sunshinny00 sunshinny00
  • 23-10-2016
  • Mathematics
contestada

Two cranes can unload a ship together in 4 hours. The faster crane takes 6 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?

Respuesta :

frenchfry15
frenchfry15 frenchfry15
  • 23-10-2016

The slower crane will unload the ship in 30 hours.

The faster crane will upload the ship in 20 hours.

:)

Answer Link

Otras preguntas

how did the civil service system change during China's government?
Which president refused to enforce the Supreme Court's ruling that the Cherokee were a sovereign nation in the case of Worcester v. Georgia? A. James Polk B.
8 is 10% of what number?
The implied meaning of a word can be analyzed through a writer's use of Naunce Nouns Facts Verbs
Anybody can attend and bring _______ pets. What pronoun goes in the blank? his or her there their a
in the equation logx 4 +logx 9 = 2, x is equal to
What does the word advent mean? having an advantage the coming or arrival of something to advance forward
compare a bear with a giraffe how do their structures help them survive
If two organisms belong to the same phylum, they both must also belong to which of the following Genus Class Kingdom Order
which desert lies along the south west coast of Africa