if 2 men and 3 boys can do a piece of work in 8 days whole 3 men and 4 boys will do it in:
A. 3 days
B. 4 days
C. 5 days
D. 6 days​

Respuesta :

cici007
cici007 cici007
  • 22-02-2021

Answer:

I think D. 6 days

Step-by-step explanation:

let me know if im wrong..

Answer Link

Otras preguntas

What is the sum of the geometric sequence 1, 3, 9, ... if there are 11 terms? (5 points) 29,524 55,987 87,381 88,573
The front of an A-frame house is in the shape of a triangle. The height of the house is 20 feet. The area of the front of the A-frame is 600 square feet. What i
After 26-year-old Kayden failed a sobriety test when he was pulled over, he was arrested for driving under the influence. He has never been in trouble before an
why is my take home less than gross pay
Solve for X 4(x + 3) = 2(x - 1)
Please help ! ∆ABC is similar to ∆DEF. The measure of AB = 6, the measure of DE = 18, the measure of BC = 12, and the measure of DF = 15. Find the measures of
Help me please I need it done by 10:00 am
is y=-x+2 a linear equation
Which comparison is correct?
Which balances the equation mg o2 → mgo? mg 2o2 → 4mgo 2mg 2o2 → 2mgo 2mg o2 → 2mgo 2mg 2o2 → 4mgo