ccthomas30 ccthomas30
  • 26-03-2021
  • Physics
contestada

A 720 N box is pushed by a mover 60 meters in 30 seconds. How much work is done?

Respuesta :

Cricetus
Cricetus Cricetus
  • 31-03-2021

Answer:

The work done will be "43,200 J".

Explanation:

The given values are:

Force,

F = 720 N

Distance,

S = 60 m

Time,

t = 30 sec

As we know,

⇒  [tex]Work \ done=Force\times Distance[/tex]

On substituting the values, we get

⇒                     [tex]=720\times 60[/tex]

⇒                     [tex]=43,200 \ J[/tex]

Answer Link

Otras preguntas

In “The Place and the People,” what is the impact of the frame story structure on the text?
What is the safest thing to do for someone suspected of having hypothermia?
Given: WA = NO, WS = NT, W = N. A)SSS B) SAS C) ASA D)AAS
A quiz has 4 multiple-choice questions with 4 possible answer choices each. for each question, there is only 1 correct answer.a student guesses each answer at r
rocko has been learning about functions in math class and realizes he can use it to help him get prepared for his next wrestling match. rocko needs to loose wei
Find the volume of this oblique pyramid.
In my day day routine you use math when you go to the grocery store, bank,mall and when cooking. How do you imagine that you will use math in your health care c
Before passing another vehicle, the first major step is to ________.
"let v = r 2 with the usual addition and scalar multiplication defined by k(u1, u2) = (ku1, 0). determine which of the five axioms of vector spaces involving sc
Which of the earth's spheres includes its mantle core and crust?