episshasosilemba episshasosilemba
  • 23-04-2021
  • Business
contestada

What is the first phase of the project process?


A. Monitoring


B. Pre-Planning


C. Implementation


D. Planning

Respuesta :

tif21076 tif21076
  • 06-05-2021

Answer:Pre-planning

Explanation:

Answer Link
zlskfrum zlskfrum
  • 06-05-2021

Answer:

Explanation:

Implementation and Monitoring are latter phases of a project.  Pre-planning goes before Planning so the answer is B.

Answer Link

Otras preguntas

Which of the following is a nonrenewable resource? A. silver B.wind C.sunlight D. trees
which of the following is an example of an opened-ended question
susie says that no parallograms have right angles. is she correct? if not name a shape that disproves Susie's Statment
Washing machine symbolWhat does it mean
Bertie needs 2 1/3 cups of flour fro each pan of biscuits she bakes. She wants to bake 3 1/2 pans. how many cups of flour does Bertie need?
Subway I 8 out of 11 people are carrying a briefcase based on this information if there are 700 people on a subway then about how many do not have a briefcase
One of the three main categories of blood is
if anyone could help me answer please do!
this type of energy travels through vibrations on waves this type of energy can be transferred in three different ways: 1) direction contact through colli
Describe how wildlife was directly affect (2004 Asian tsunami)