rl239085
rl239085 rl239085
  • 23-04-2021
  • Mathematics
contestada

Stevie can refinish a driveway in 4 hours. Ray can refinish the same driveway in 3 hours. Princess can refinish the same driveway in 2 hours. If all three work together, how long would it take them to refinish 5 driveways? Show all work

Respuesta :

Аноним Аноним
  • 23-04-2021

Answer: 45 because 4+3+2=9 and 9x5=45

Answer Link

Otras preguntas

What did Sigmund Freud call his method of treating patients?
how do I work this problem: -5y + 8 = -3y + 10 ?
what is -4.15 as a fraction
When were the first successful photographs made using a camera?
Which piece of equipment would be used to measure the volume of a liquid?
Which of the following offices cannot be found in Lyndon Johnson's political resume?
Complete each blank to find an expression that is equal to 16%. a. __ for every 100, b. __for every 50, c. 1 for every __, d. 0.5 for every __.
Choose all that apply. How did language help to develop cultures? a.t gave tribes names for tools. b.It gave people better tools to work with. c.It helped dev
Which of these connects the Red Sea and the Mediterranean Sea? A) Suez Canal B) Panama Canal C) Bering Strait D) Bosporus Strait
What amendments are in the civil rights act of 1866?