TyreeSerini163 TyreeSerini163
  • 24-03-2014
  • Mathematics
contestada

Six people to can perform a task in 8 days. If we add 2 equally able people, how long would it take?

Respuesta :

madankapoor10
madankapoor10 madankapoor10
  • 24-03-2014
1 man does 1/48th piece of work per day
then 8 man do 1/6th piece of work per day
so they can do the work in 6 days

Answer Link
salmheiri
salmheiri salmheiri
  • 21-02-2022

Answer:

6 days

Step-by-step explanation:

Answer Link

Otras preguntas

I need to know the answer to question number 6 please and thank you
How large is the observable universe
Typically investors purchase stocks or bonds through all of the following except
Prior to the French Revolution, what was the basis for the division among the Three Estates?
[OU.03]The table below shows the initial masses of four stars. Name of Star Star 1 Star 2 Star 3 Star 4 Initial mass of star (in Solar mass) 9 0.9 5 0.3 Which o
Which religious movement is George Whitefield MOST closely associated? a. Restorationism b. Predestination c. The Great Awakening d. Unitarian Universalism
Original equation: y = 2x + 7 Which equation will shift the graph of the original equation 2 units up? A) y = 2x + 9 B) y = 4x + 7 C) y = 2x + 2 D) y = 2x - 2
What does Fern do that proves she can hear the animals talk? A. She reacts to what the animals say. B. She makes comments to the animals. C. She asks the anima
What polynomial identity should be used to prove that 21 = 25 − 4
A square pyramid is shown: A square pyramid is shown. The sides of the square base are labeled 0.5 foot. The height of one of the triangular sides is labeled 9