t4k3n
t4k3n t4k3n
  • 23-06-2021
  • Mathematics
contestada

if 8 people do a job in 40 hours. How many people need to do the job in 32 hours?

Respuesta :

breadsticksandcheese
breadsticksandcheese breadsticksandcheese
  • 23-06-2021

Answer:

6 people

Step-by-step explanation:

8/40 = x/32

multiply both sides by 32: 8(32)/40 = x

x = 256/40

= 6.4

≈ 6

Answer Link

Otras preguntas

which feature forms most of the ocean floor
A bicyclist rides with a constant velocity of 8 m/s. What would you need to know to calculate the net force on the rider?
Isooctane has the molecular formula C8H18. What is its empirical formula
Find the product and simplify (X-4)(3x-y)
The following sentence is taken from a U.S. Bureau of Land Management publication. The sentence is discussing a new manual that the BLM published to set guideli
FINGERNAIL: After m months, the length of a fingernail is 10 + 3m millimeters. How long is the fingernail after eight months? three years
what are the roles of consumers and producers in allocating resources
Skeletal muscles are connected to bones by thick bands of tissue called _____.
Simplify: a^2b^2c^2(2ab+3ac+2bc)
what is a adverb and a conjunction?