ebiswawilondja220 ebiswawilondja220
  • 25-08-2021
  • Mathematics
contestada

A contractor removed 357 cubi c ya rds of earth from a building site. If the contractor’s trucks can haul 17 cubic yards per load, how many truckloads of earth were moved?

Respuesta :

chasebruns920 chasebruns920
  • 31-08-2021

Answer:

21 loads

Step-by-step explanation:

357/17=21

Answer Link

Otras preguntas

During permineralization, a bone will A trap a decomposer. B be destroyed by sun. C be exposed to scavengers. D be slowly filled in with minerals.
What might happen if a local government did not make use of special districts?
6a^3b-1 . 2a^4b^2 I need help with my math​
Mary is averaging her grandchildren’s credit scores. She has arranged the scores in the table shown below. What is the median credit score in this group? (Round
Missed angles puzzle pls help
With regarding to privacy settings, which statements are true?
Can someone give me one idea for 2.essay I ll mark blainlist
The two dot plots show the number of goals per game. The data for each is taken from a random sample within a soccer league over a 1-month period. Complete the
Graph this, use at least four points.
18 which solution has a molality of 0.25 m Naci? 0.5 mol Naci in 4.0 kg water 0.25 mol NaCl in 10 kg water 0.25 g Nai in 1.0 kg water 1.0 kg NAC in 40 kg water