Project planning output is :

A. Top-down planning

B. Bottom up planning

C. Waterfall planning

D. Iterative planning

Respuesta :

MubeenAshraf
MubeenAshraf MubeenAshraf
  • 25-12-2021

Answer:

A

Explanation:

The main output of Project palnning is project plan.

Answer Link

Otras preguntas

This is breakdown of attendees at an event Men 153 Women 357 Boys 153 Girls 187 What percentage of the attendees are men? What percentage are children?
Find the distance traveled by a car moving at an average speed of 40 miles per hour 3 hours.
A plane with a mass of 6,800 kg is moving at a speed of 55.0 m/s. What is the kinetic energy of the plane?
Which of these choices is a physical property that does not change when the size of the sample changes
−6.2<−4.5, yet |−6.2|>|−4.5|. Use a number line to show why.
Which scientist was responsible for studies of population of species?
the perimeter of a rectangle is 158.5 cm the length of the rectangle is 42.5 cm what is the width of the rectangle
Someone please help me!
True or False? Don’t understand.
how can watching fish decrease heart rate and muscle tension?