breashaeeboo5784 breashaeeboo5784
  • 22-04-2024
  • Business
contestada

Which of the following stakeholders should be included in a project recommendation?
1) Stakeholders
2) Customer
3) Project manager
4) CEO of the contractor's organization

Respuesta :

Yusuftamer Yusuftamer
  • 22-04-2024

Answer:

shdhdbdbddd hdbsbsbdhd hdbhdbr r hadvd

Explanation:

bdbsbs sjabe sh sgssk s hsd

Answer Link

Otras preguntas

It takes arman 48 minutes to mow 4 lawns. Assuming the lawns are the same size and Arman works at the same speed, about how long will it take him to mow 7 lawns
Water that flows downhill along Earth's surface is called A. cycles. B. runoff. C. rain. D. beach hydraulics.
Help with number 24 please???
what was the point of the French Constitution of 1791
draw a model of 20 divided by 5
. How many yards are in 5 miles? A. 5,280 yd. B. 8,800 yd. C. 1,760 yd. D. 26,400 yd.
what is the role of the sun in the water cycle
carol and her mom have the similar noses, eyes, and hands. Which of the following explains why Carol and her mom have similar traits?
During a rainstorm, water seeps into the ground. This process is called _____.
while camping you see the reflection of the moon on the lake. it looks like a bright flat sphere on the water. what phase of the lunar cycle is the moon likely