Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

Trying to help my son with foundations of algebra simplifying
It is 15:35.in another 50 hours will it be morning or afternoon?
QUICK HELP!!!!! What does it mean to you when it says "Peace cannot be kept by force, it can only be achieved by understanding
The temperature is 5°C below zero. Which integer represents this temperature? +5 −5
Divisibility rules 3 6 and 9
A grouping of two or more lines of a poem in terms of length, metrical form, or rhyme scheme is called what?
Please help!!!!!!!!!!!!!!
What is the purpose of accentuating a musical note in an unexpected place in a piece of music?
What does it mean if a beta fish is swimming on its side and its belly is all puffed up and bloated?
What is the value of 1 raised to the power of any exponent? what is the value of 0 raised to the power of any nonnegative nonzero exponent? explain