mirzalover7
mirzalover7 mirzalover7
  • 25-11-2017
  • Mathematics
contestada

a task completed by 30 persons in 4 days. in how many days, the same will be completed by 40 persons?

Respuesta :

Plasmataco
Plasmataco Plasmataco
  • 25-11-2017
Basically to solve this you do:
Time1*Worker1=Time2*Worker2
Thus Time1=4, Worker1=30, Worker2=40
4*30=40*Time2
Time2=4*30/40
Time2=3 days
Answer Link

Otras preguntas

Is the following true or false? Continental glaciers fill depressions in the surface with water, where they create cirques.
What are two ways that organisms are connected to the non living environment?
_____ is a process whereby stimuli are placed into existing categories of meaning.
Great victoria desert, great sandy desert, and tanami desert are called what
If you shrug your shoulders while saying I don't know your nonverbal communication is___ A•Replacing B•Emphasizing C•Accenting D•Repeating
If you find a vehicle that you like and are trying to decide to lease it or buy it over four years, which of the following statement is true? A) Your monthly pa
I would have grabbed the ball if I ________ closer to it. Choose the correct subjunctive verb form to complete the sentence. A) is B) was C) been D) had bee
Which would be least likely to completely dissolve in water? A.hydrochloric acid B.sulfuric acid C.nitric acid D.acetic acid
Heat flows due to: Select one: a. conduction b. convection c. radiation d. all of the above
When 4 moles of aluminum are allowed to react with an excess of chlorine gas, Cl2, how many moles of aluminum chloride are produced?