bignate959 bignate959
  • 23-01-2018
  • Mathematics
contestada

In a special project, if step x must be completed before step y, step x is called a _____ task.

Respuesta :

gavinpaull1412 gavinpaull1412
  • 23-01-2018
It’s about 28.4, if you need the exact use your phones calculator
Answer Link

Otras preguntas

Are you willing to sacrifice your individual freedoms for the idea of national security?? help please
find mKML mKML= HURRYY!!!
HELPPP 40 POINTS!!!! Mr. Tedesco has two metal cubes, one made of tin and the other made of silver. He heats the tin cube to 80°C and places the silver one in t
Scenario C. Victor, the president of Tortoise Bay Pharmaceuticals Inc., sends a memo to his vice presidents regarding new procedures for succession planning in
Is a triangle with side lengths of 9 feet, 12 feet, and 16 feet a right triangle?
A cab company charges a flat fee of $4 for a new passenger. it then charges $2.35 per mile until until the destination is reached 1- 4m+ 2.35=total cost 2- 4m
What did President Roosevelt believe about the powers of the president?
I need a argument to: Differences in the structure of protein molecules affect how they connect to other protein molecules. This can result in different traits
Why is it important the order we write the vertices of a triangle in a congruent statement? SELECT ALL THAT APPLYI
A dwelling with a replacement cost of $150,000 was insured under a Homeowners 3 policy for $105,000 at the time the roof was destroyed by a windstorm. The actua