thetrojantv
thetrojantv thetrojantv
  • 23-02-2018
  • Mathematics
contestada

these are so hard please help me and answer the last 4 I posted

these are so hard please help me and answer the last 4 I posted class=

Respuesta :

Аноним Аноним
  • 23-02-2018
kai:
6 days = 1 shed
1 day = 1/6 shed

Mark:
8 days = 1 shed
1 day = 1/8 shed

Together:
1 day = 1/6 + 1/8 shed 

Ans: 1/6d + 1/8d = 1

Answer Link
carlosego
carlosego carlosego
  • 23-02-2018
The first thing you should know is that the rate of each one is:
 Kaitlyn = 1/6
 Mark = 1/8
 Then,
 d = number of days.
 The equation then if they work together is:
 1 / 6d + 1 / 8d = 1
 answer:
 the equation for number of days it would take to build the sheld together is
 1 / 6d + 1 / 8d = 1
Answer Link

Otras preguntas

Which states of water can you find in your home
A car travelling at 45 mi/hr (20.1 m/s) comes to rest in 4 seconds. Find the acceleration of the car in m/s2.
how is 16/7 simplified???????
why do you think people choose to settle in area with abundant natural resources
Estimate the product of 21 and 32
I am not sure if i did this right she wants us to distribute and get only one x on one side and find the answer.
senators are elected six years and may be re-elected as often as the people wish to vote for them. true or false?
Which states of water can you find in your home
Find the area of the figure. Assume the figure is made up of triangles. A. 98 cm² B. 147 cm² C. 196 cm² D. 294 cm²
0.15=0.150 true or false